Notice- Water System Flushing

Due to a natural occurrence in surface raw water characteristics, which are common, or emergency mechanical repairs in your water production and treatment system we will experience a limited aesthetic, taste, odor, or color issue(s). Our first responders and repairs teams are aware, in route, and currently working to resolve the issues to restore service as soon as possible. Please be advised that “Aesthetics -Taste, Odor and Color” are EPA Secondary Standards and pose no health risk. Our Certified operators and laboratories are conducting routine sampling per Texas Commission on Environmental Quality rules and regulations and should a precautionary or required Boil Water Notice be required we will issue as prescribed in PWS 30 TAC, subchapter F, Section 290.122(a), PWS 30 TAC 290.109(b)(1)(A-D)], PWS 30 TAC 290.46(q)(4), & PWS 30 TAC 290.46(q). Currently the restoration time is unknown but, in most cases, services are normally restored within 4-8 hours. Please check with your Municipal Utility District Website for additional updates.

For more information about drinking water aesthetics please visit the City of Houston website https://www.houstonpublicworks.org/taste-odor-color#230548828-4059462927. Thanks in advance for your cooperation and understanding during this water quality event.

Sincerely,
Management,
Precision Utility LLC

Notice- Water System Flushing2024-05-20T13:39:59+00:00

Freeze Preparations

Due to the artic front moving across the Continental US and through the State of Texas early next week we encourage all Precision Utility customers to make advance preparations which include the following: wrap exposed piping, cover plants, or bring them inside, and take care of your pets. We also encourage to conservatively, due to water supply, drip a faucet during freezing temperatures, to prevent leaks. The dripping of faucets will minimally affect your water bill and be a lot less than making repairs. We are expecting cold temperatures for a few days and our Texas winters are technically December, January, and February. At this time, we are not expecting sleet, snow, or high winds; should those factors arise our call center will remain closed, but our on-call personnel will be on standby. If roads are impassable, we will reconvene when it is safe for travel. As always, when we receive service requests, we will be in-route to restore utility services as soon as possible, and when it is safe for crews.

Sincerely,
Management,
Precision Utility LLC

Freeze Preparations2024-05-20T13:39:48+00:00

CHCRWA terminates Stage 2 of its Drought Contingency Plan, Stage 1 remains in effect

The Central Harris County Regional Water Authority is lifting Stage 2 of its’ Drought Contingency Plan (DCP), due to reduced demand. Please keep in mind that Stage 1 of the DCP remains in effect.

We thank you for your cooperation during the implementation of Stage 2 of its DCP. We will continue to monitor water use and will provide further notice if the drought stage changes or if Stage 1 drought conditions are lifted.

Thanks in advance for your understanding and cooperation,
Harris County MUD No. 304

CHCRWA terminates Stage 2 of its Drought Contingency Plan, Stage 1 remains in effect2024-01-15T14:30:46+00:00

November 7, 2023 Texas Constitutional Amendment Election

Early voting is currently ongoing from October 23 through November 3 (closed Saturday/Sunday in some counties), and Election Day is Tuesday, November 7, 2023.  For more information about your specific polling locations, ballot measures, etc., please see your respective county voter registrar page at:https://www.sos.state.tx.us/elections/voter/links.shtml#County.

November 7, 2023 Texas Constitutional Amendment Election2024-01-15T14:35:43+00:00

Implementation of Stage 2 of Drought Contingency Plan

 Due to minimal rainfall and persistent high temperatures throughout Harris County, please be advised that the Central Harris County Regional Water Authority (the “Authority”) will enter Stage 2 (Moderate Drought) of its Drought Contingency Plan (“DCP”), effective August 27, 2023. The Authority has determined that it is necessary to trigger Stage 2 in order to facilitate compliance with its Groundwater Reduction Plan and the requirements of the Harris-Galveston Subsidence District.

The Authority’s DCP currently provides that Stage 2 may be triggered if the City of Houston (the “City”) reduces the quantity of its supply of water to the Authority by more than 10% but less than 20% for five (5) consecutive days or if the City has implemented Stage 2 of its DCP. Although the City has not reduced its supply of water to the Authority to date, the City has issued notice of its intent to enter Stage 2 of its drought contingency plan on August 27, 2023, and requested the implementation of mandatory water conservation measures. Accordingly, the Authority has elected to trigger Stage 2 of its DCP and hereby requests that all Member Districts implement their respective drought contingency plans and mandatory water conservation measures beginning August 27, 2023. 

During Stage 2, the Authority recommends that the Member Districts, at a minimum, restrict and/or prohibit non-essential water use for the following activities: (1) street washing; (2) fire hydrant flushing; and (3) filling of swimming pools. The Authority will continue to monitor water use and will provide further notice if the drought stage changes or if Stage 2 conditions have been lifted. 

A copy of the Authority’s DCP can be found on the Authority’s website at https://www.chcrwa.com/documents/. Should you have any questions concerning the above-referenced matter, please contact the Authority’s Operator, Jared Martin of Municipal Operations & Consulting, Inc., at jmartin@municipalops.com. Thank you for your cooperation.

Implementation of Stage 2 of Drought Contingency Plan2023-10-25T17:59:01+00:00

Drought Contingency Implementation of Stage 1

Attention Harris County Municipal Utility District No. 304 (“HC MUD No. 304”) Customers and Residents. The Central Harris County Regional Water Authority, North Harris County Regional Water Authority, and the City of Houston Public Works Department / Public Utility Division has initiated stage one of their respected Drought Contingency Plans (“DCP”). Harris County MUD No. 304 DCP that was adopted on April 21, 2005 and outlines water conservation methods of stage I to include the following:

Stage I Target: a voluntary 15% reduction in daily water demand this would reduce the world run time from 18 to 14 hours or less.

Supply Management Measures: the districts operator shall undertake any actions which he or she deems necessary including reducing system pressure and or reducing interconnection with another water system.

Demand Management Measures Applicable to Wholesale Water Customers – See “DCP”.

Voluntary Water Use Restrictions Applicable to Retails Water Customers – See “DCP”.

Effective 08/18/2023 HC MUD No. 304 will initiate Stage I of its Drought Contingency Plan. Thanks in advance for your understanding and cooperation,
Harris County MUD No. 304

Drought Contingency Implementation of Stage 12023-08-26T00:02:00+00:00

August Meeting Cancelled

The Board Meeting Scheduled for August 17th has been canceled due to the inability to make quorum. The next meeting is scheduled for September 21st, 2023 at 6:00 p.m.

August Meeting Cancelled2023-08-18T17:36:27+00:00

Surface Water/Groundwater Update

Please be advised that due to the Regional Water Authority Surface Water algae bloom and extreme heat forecast we will be transitioning from surface water to ground water provided by water well #1 at the Water Plant. We will be closely monitoring the situation and working with the Central Harris Regional Water Authority as updates arise. As conditions improve, we will notify all affected communities that we will be transitioning back to surface water. In the interim we will be flushing the district to mitigate any water quality issues.

Thanks for your cooperation and understanding.

Surface Water/Groundwater Update2024-01-15T14:36:15+00:00

Regional Water Authorities- Surface Water Issue – Odor

Precision Utility has received a notice from the Regional Water Authorities that surface water provided through the regional water authorities have received complaints about water taste and odor. The cause of this is linked to algae blooming influenced by temperature.

A notice provided by the Regional Water Authorities will be included with this memo to provide more information on the cause of this issue. The latest update provided stated that they are actively trying to correct this issue, however we should have a contingency plan on standby in case water quality doesn’t improve.

The contingency plan for our districts would be running the groundwater wells in place of surface water, until their issues with surface water have been corrected. The main
reason that we have not moved forward with this plan already is due to additional water quality issues that may arise from using only well water. These water quality issues may affect color, taste, and odor.

For now, to mitigate this issue, Precision Utility technicians are flushing affected districts to bring in fresher water.

Mr. Bonaventure has been in contact with NHCRWA and CHCRWA Operators. Any updates provided on this issue will be forwarded to all interested parties.

Thank you for your attention to this matter.

On Behalf of Tony Bonaventure, MBA
Manny Vadhar, Controller
Precision Utility, LLC

 

Click below for additional information regarding the memo from the Regional Water Authorities

Regional Water Authorities- Surface Water Issue – Odor2024-01-15T14:36:39+00:00
Go to Top